7.2.2.5 Installation Process

The installation process involves installing an
RRU
and RRU cables, checking the RRU hardware
installation, and powering on an RRU.
shows the installation process.
Figure 1
Figure 1 Process of installing an RRU
Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
< Previous topic Next topic >
7.2.2.6 Hoisting an RRU and Related Cables
onto a Tower
This section describes the procedure for hoisting an
RRU
and related cables onto a tower and the
precautions that must be taken.
Hoisting an RRU onto a Tower

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RRU5909 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Rru5309wRru3959aRru5309

Table of Contents

Save PDF