Closing The Cover Plate Of An Rru Cabling Cavity; Checklist For The Rru Hardware Installation - Huawei RRU5909 Installation Manual

Table of Contents

Advertisement

Figure 3 Closing the cover plate of an RRU cabling cavity
(1) Locking screw
4. Take off the ESD gloves, and pack up all the tools.
Parent Topic:
Installing RRU Cables
Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
< Previous topic
7.2.2.9 Checking the RRU Hardware
Installation
provides the checklist for the
Table 1
Table 1 Checklist for the RRU hardware installation
SN
Item
1
The position for each device conforms to the engineering drawing and meets the space
requirement. Sufficient space is reserved for equipment maintenance.
2
The RRU is securely installed.
3
The cover plate is securely installed on the RRU cabling cavity.
RRU
hardware installation.

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the RRU5909 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Rru5309wRru3959aRru5309

Table of Contents

Save PDF