ELECTRICAL CONNECTION
NOTE: Electrical connection must be performed by a
qualified installer only.
NOTE: The electrical connection must comply with Na-
tional and Local codes.
A strain relief for the supply cord is required. The installer
must provide a supply cord bushing that meets all Local
and National Installation Standards.
If using a flexible cord, it needs to be type H07RN-F.
For Gas Models:
NOTE: Gas models have a phase sensitive burner con-
trol unit. If the phase and neutral are switched the
control locks out.
Connect phase + neutral + ground.
KW/Section
Voltage
CTB/CTBR
5,6
400
8,0
400
Mark V-100
11,0
400
Zephaire-200-E
11,0
400
Zephaire-100G-ES
0,7
230
Zephaire-200G-ES
0,7
230
DFG-100-ES
0,7
230
DFG-200-ES
0,7
230
Frequency
Phase
(Hz)
3N
50
3N
50
3N
50
3N
50
1N
50
1N
50
1N
50
1N
50
For Electric Models:
Connect the oven to a separate group with rigid connec-
tion and circuit breaker. The circuit breaker should discon-
nect all poles, including neutral with a contact separation
of at least 3 mm.
For 1 Phase - Connect phase + neutral + ground.
For 3 Phase -Connect L1 + L2 + L3 + neutral + ground.
INITIAL STARTUP
1. Set the THERMOSTAT to 260°C and operate for 2
hours prior to loading product. This procedure pro-
duces smoke.
2. Clean the oven after the initial burn-in process. See
page 13 for proper cleaning instructions.
L1
L2
9
8
13
11
18
15
18
15
3
-
3
-
3
-
3
-
9
Installation
Utility Connection
Max Load
L3
N
8
1
11
2
15
3
15
3
-
3
-
3
-
3
-
3
mm
2
5 x 2.5
5 x 2.5
5 x 2.5
5 x 2.5
3 x 1.5
3 x 1.5
3 x 1.5
3 x 1.5