Chapter 1: Introducing the SolarEdge Power Harvesting System
11
Figure 2: Synergy Manager with three Synergy Units
Monitoring Platform
The monitoring platform enables monitoring the technical and financial performance of
one or more SolarEdge sites. It provides past and online information on the system
performance, both at the system and PV module levels.
Designer
Designer recommends inverter and Power Optimizer selection per site size and enables
report generation. You can create a project in Designer and export the site design with
the string layout to the monitoring platform.
Supported AC Grids
This section details the AC grids supported by SolarEdge inverters (model dependent).
Ground connection is required for all grids, as described in "Connecting Ground and AC
to the Synergy Manager" on page 39.
For overview of common AC grids and the compatibility of SolarEdge inverters, refer to
Grids Supported by SolarEdge
Inverters.
Installation Tools and Material List
Standard tools can be used during the installation of the SolarEdge system.
The following recommend tools is required for installation:
Three Phase Inverter with Synergy Technology P/N: SExxK-xxxxIxxxx SExxK-xxxxIxxxx