Site Requirements; Unpacking; Package Contents; Unpacking The Device - Dell PowerConnect 54 Series User Manual

Table of Contents

Advertisement

Site Requirements

The device can be mounted in a standard 19-inch rack or placed on a tabletop. Before installing the device,
verify that the location chosen for installation meets the site requirements.
General — Ensure that the power supply is correctly installed.
Power — The device is installed within 1.5 m (5 feet) of a grounded, easily accessible outlet 220/110
VAC, 50/60 Hz.
Clearance — There is adequate frontal clearance for operator access. Allow clearance for cabling, power
connections and ventilation.
Cabling — Cabling is routed to avoid sources of electrical noise such as radio transmitters, broadcast
amplifiers, power lines and fluorescent lighting fixtures.
Ambient Requirements — The ambient unit operating temperature range is 0 to 45ºC (32 to 113ºF) at a
relative humidity of 10% to 90%, non-condensing. Verify that water or moisture cannot enter the unit
casing.

Unpacking

Package Contents

While unpacking the device, ensure that the following items are included:
The device
An AC power cable
RS-232 crossover cable
Self-adhesive rubber pads
Rack mount kits for rack installation
Documentation CD

Unpacking the Device

To unpack the device:
NOTE:
Before unpacking the device, inspect the package and report any evidence of damage immediately.
NOTE:
An ESD strap is not provided, however it is recommended to wear one for the following procedure.
1 Place the container on a clean, flat surface and cut all straps securing the container.
2 Open the container or remove the container top.
3 Carefully remove the device from the container and place it on a secure and clean surface.
4 Remove all packing material.
5 Inspect the device for damage. Report any damage immediately.
30
Installing the PowerConnect Device

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerconnect 5424Power connect 5448

Table of Contents