Displaying Measured Values As A Line Graph - Ahlborn ALMEMO 5690-2M Operating Instructions Manual

Data acquisition system
Hide thumbs Also See for ALMEMO 5690-2M:
Table of Contents

Advertisement

11.3.5 Displaying measured values as a line graph

Line graph
In the
the selected channel is displayed, as soon as a
measuring operation starts, as a line graph with
100 x 200 pixels. The curve is continuously up-
dated from right to left according to the time
resolution defined by the cycle; each scan af-
fects one pixel. The resulting time data for the
whole t axis is displayed as (days) hours : min-
utes in the bottom right corner. In the top right
corner the time-of-day is displayed. The curve
is updated throughout the active measuring op-
eration - even if the user leaves the menu (so
long as the selected measuring point is not
changed).
Limit values, if activated, are displayed as dotted lines.
To set the display for the y axis the functions Analog start and Analog end in
the
Special functions
also be entered directly on the axis, pressing
Displaying a measured value as line graph
Times - cycles
In the
Time axis 120 x 5s = 10 mins
To select a measuring channel press
To scale the y axis press
Analog end at top
To modify value (see 10.5) press
...
Analog start at bottom, ditto
Stop input
Start measuring operation
Stop measuring operation
During the measuring operation channel switching is blocked.
Each time a measuring operation starts and each time the channel
is switched the line graph will be cleared.
menu the measured value of
menu should be used; (see 12.4.4). These functions can
menu enter the cycle
Measuring point scan and output
PROG
.
Cycle:
00:10
or
PROG
40.0
PROG
,
<ESC>
<START>
<STOP >
ALMEMO
®
00:00:05
...
%H
/
...,
20.0
%H
´ © ´
´ ll ´
5690-2M
39

Advertisement

Table of Contents
loading

Table of Contents