Unpacking; Connections; Spare Parts And Accessories - GE AKTAprime plus Operating Instructions Manual

Table of Contents

Advertisement

3 Installation

3.3 Unpacking

3.3
Unpacking
Check for damage
Check the equipment for damage before starting assembly and installation. There are
no loose parts in the transport box. All parts are either mounted on the system or located
in the accessory kit box. If any damage is found, document the damage, and contact
your local GE Healthcare representative.
Unpack the system
Remove straps and packing material. Then set the equipment upright before starting
installation.
3.4

Connections

Communication
Connect the system according to the electrical drawings in Electrical and communication
connections, on page 11.
Flow path
All parts and tubing are mounted on the system at delivery.
Connect a waste tube, buffer and sample bottles, and optional accessories.
Electrical power
Connect the power cord to a grounded power outlet specified in Section 3.1 Site require-
ments, on page 31.
3.5

Spare parts and accessories

For correct up to date information on spare parts and accessories visit:
www.gelifesciences.com/AKTA
32
ÄKTAprime plus Operating Instructions 28-9597-89 AB

Advertisement

Table of Contents
loading

Table of Contents