GE AKTAprime plus Operating Instructions Manual page 38

Table of Contents

Advertisement

4 Operation
4.3 Preparations before start
4 Check that the tube sensor (1) is in the correct position for the tube size. The eluent
5 Rotate the rack by hand until the rear half of the tube sensor rests against the first
6 Press feed tube on the front panel (see Figure 1.2). The bowl moves to the correct
7 Make sure that drop synchronization is turned on.
Note:
Preparing the monitors
1 Check the UV lamp filter position and the lamp position.
2 Calibrate the pH electrode (optional).
See ÄKTAprime plus User Manual for more information.
Filling the buffer inlet tubing
When running an application templates, the buffer inlet tubing will automatically be
filled with buffer.
For other applications, fill the inlet tubing manually with buffer as described in the
ÄKTAprime plus User Manual.
Filling the sample loop
Using an injection fill port
38
tubing should be over the center of the collection tube. Use the red sensor control
knob (2) to position the tube holder (3).
3
2
1
tube.
position to collect the first fraction in the first tube.
Drop synchronization can NOT be used at flowrates above 3 ml/min.
ÄKTAprime plus Operating Instructions 28-9597-89 AB

Advertisement

Table of Contents
loading

Table of Contents