Unpacking; Site Requirements - GE pH/C-900 Operating Instructions Manual

Monitor
Table of Contents

Advertisement

Section
4.10 Preparing the instrument for use
4.1

Unpacking

Unpack the instrument and check the items against the supplied packing list. Check the
equipment for damage before starting assembly and installation. There are no loose
parts in the transport box. All parts are either mounted on the system or located in the
accessory kit box. If any damage is found, document the damage, and contact your local
GE representative.
It is recommended that all packing materials should be retained if onward transport of
the instrument is expected.
4.2

Site requirements

Parameter
Operation site
Altitude
Electrical power
Transient overvoltages
Ambient temperature
Placement
Humidity
Atmospheric pressure
Pollution degree
The instrument should be located in a place of low temperature variations, away from
heat sources, draughts and direct sunlight.
To ensure correct ventilation a free space of 0.1 m is required behind and in front of the
instrument. Do not use any soft material under the instrument, to ensure that the venti-
lation inlet in the front is not blocked.
Monitor pH/C-900 Operating Instructions 29-0549-25 AB
Requirement
Indoor use
Maximum 2000 m
100/240 V AC ±10%, 50/60 Hz
Overvoltage category II
4°C to 40°C
In ÄKTAexplorer or ÄKTApurifier.
20% to 95% relative humidity (noncondensing)
84 to 106 kPa (840 to 1060 mbar)
2
4 Installation
4.1 Unpacking
See page
32
27

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents