Chrysler Sebring 2004 Service Manual page 1099

Table of Contents

Advertisement

9 - 172
ENGINE 2.7L DOHC
CAMSHAFT(S) (Continued)
1 – CAMSHAFT BEARING CAP - INTAKE
2 – CAMSHAFT BEARING CAP - EXHAUST
3 – CAMSHAFT - EXHAUST
4 – ROCKER ARM
5 – HYDRAULIC LIFTER
6 – CYLINDER HEAD
REMOVAL
(1) Remove the primary timing chain. (Refer to 9 -
ENGINE/VALVE
TIMING/TIMING
AND SPROCKETS - REMOVAL)
(2) Remove secondary chain tensioner mounting
bolts.
NOTE: Camshaft bearing caps have been marked
during engine manufacturing. For example, number
one exhaust camshaft bearing is marked "1E>"
(3) Slowly loosen camshaft bearing cap bolts in
reverse order of installation (Fig. 26).
(4) Remove camshaft bearing caps.
(5) Remove camshafts, secondary chain, and ten-
sioner together as an assembly.
(6) Remove tensioner and camshaft chain from
camshafts.
(7) Inspect camshafts. (Refer to 9 - ENGINE/CYL-
INDER HEAD/CAMSHAFT(S) - INSPECTION)
Fig. 25 Camshaft and Valvetrain Components
BELT/CHAIN
7 – CAMSHAFT (SECONDARY) CHAIN TENSIONER
8 – CYLINDER BLOCK
9 – CYLINDER HEAD
10 – CAMSHAFT - INTAKE
11 – CAMSHAFT (SECONDARY) TIMING CHAIN
Fig. 26 Camshaft Bearing Cap Tightening Sequence
JR

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sebring convertible 2004Stratus 2004

Table of Contents