AMI Codes-II TC
Instrument Setup
4.4.
4.5.
Programming
38
Fill or Flush Reagent System
Fill or flush the reagent tubing:
upon the initial instrument setup,
after refilling the reagent canisters,
before a system shut-down to flush the system with deminer-
alized water until no more reagent is left in the system.
Service
Verification
Fill System
Cleaning
Fill System
Progress
<Enter> to stop
Fill System
Progress
Done
1 Check tubing and flow cell for leaks and repair if necessary.
2 Let the instrument run continuously for 1 hour.
Programming
Program all parameters for external devices (interface, recorders,
etc.)
Program all parameters for instrument operation (disinfectant, lim-
its, alarms).
Program the DPD value of the Verikit in menu <Installation/
Sensors/Ref. Verification>.
If pH option is installed, program the two buffers you want to use for
calibration in menu <Installation/Sensors/Standards>.
See
Program List and Explanations, p.
Navigate to menu< Maintenance /
3.2.2
Service/Fill system>.
Press [Enter].
The peristaltic pump is activated for
3.2.2.5
1.5 minutes.
Press [Exit] 4 x to go back to the oper-
3.2.2.5
ating mode.
80.
A-96.250.631 / 280219
Need help?
Do you have a question about the AMI Codes-II TC and is the answer not in the manual?