AMI Codes-II TC
Installation
A-96.250.631 / 280219
Level
To install the constant head tube proceed as follows:
1 Unpack the constant head tube [C].
2 Push the constant head tube into the flow cell block [E].
3 Put the constant head cover [A] onto the constant head tube.
4 Check if the overflow tube [B] is aligned with the upper level
mark.
A
Constant head cover
A
B
Overflow tube
C
Constant head tube
D
Gasket
E
Flow cell block
B
C
D
E
21
Need help?
Do you have a question about the AMI Codes-II TC and is the answer not in the manual?
Questions and answers