Installation Direction - Mitsubishi Electric NZ2GN2B1-32D User Manual

Programmable controller cc-link ie tsn remote i/o module
Hide thumbs Also See for NZ2GN2B1-32D:
Table of Contents

Advertisement

Installation direction

The I/O module can be installed in six directions.
Use the DIN rail (1) to install the I/O module.
(1)
6
6 INSTALLATION AND WIRING
63
6.3 Installation Environment and Installation Position

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents