Mitsubishi Electric NZ2GN2B1-32D User Manual page 68

Programmable controller cc-link ie tsn remote i/o module
Hide thumbs Also See for NZ2GN2B1-32D:
Table of Contents

Advertisement

Connecting and disconnecting the cable
To connect the cable, fully insert a wire with a bar solderless terminal into a wire insertion opening.
After inserting the wire, pull it lightly to check that it is securely clamped.
(1)
Continuity can be checked with test terminal (1).
Use the following test plug to check continuity.
• PHOENIX CONTACT GmbH & Co. KG test plug (φ1.0mm): MPS-MT 1-S4-B RD, MPS-MT 1-S
To disconnect the cable, push in the open/close button with a flathead screwdriver.
With the button pushed in, pull out the wire having a bar solderless terminal.
Precautions
• Use a bar solderless terminal for the wiring to the push-in type spring clamp terminal block. If a stripped wire is inserted into
a wire insertion opening, the wire cannot be securely clamped.
• For how long the wire should be stripped, follow the specifications of the bar solderless terminal used. To attach a bar
solderless terminal to a wire, use a crimping tool.
• Before inserting a bar solderless terminal into a wire insertion opening (1), check the shape of the opening and the shape of
the terminal. Insert the terminal paying attention to the orientation. If a bar solderless terminal larger than wire insertion
opening (1) is inserted, the terminal block may be damaged.
(1)
2.4mm
1.5mm
6 INSTALLATION AND WIRING
66
6.5 Wiring of Terminal Block for Module Power Supply and FG

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents