Mitsubishi Electric MELSEC iQ-R AnyWireASLINK User Manual page 92

Master module
Table of Contents

Advertisement

AnyWireASLINK version compatibility inspection error: X8
This signal turns on when an error is detected in the AnyWireASLINK version compatibility inspection.
■Turning off of 'AnyWireASLINK version compatibility inspection error' (X8)
After the error is cleared, execute any of the following operations. Until then, 'AnyWireASLINK version compatibility inspection
error' (X8) remains on.
• Reset the CPU module or power off and on the system.
• Turn on and off 'Error flag clear command' (Y0).
• Turn off and on 'AnyWireASLINK version compatibility inspection command' (YD).
Backup/Restore unsupported error: X9
This signal turns on when the data backup/restoration is performed on the CPU module that does not support the data
backup/restoration.
■Turning off of 'Backup/Restore unsupported error' (X9)
Perform either of the following operations. Until then, 'Backup/Restore unsupported error' (X9) remains on.
• Reset the CPU module or power off and on the system.
• Turn on and off 'Error flag clear command' (Y0).
Parameter access flag (with handshake): XA
The RJ51AW12AL that supports 'Parameter accessing flag (with handshake)' (XB) is continuously on.
Parameter accessing flag (with handshake): XB
This signal turns on when any of the following output signals is turned on to start the parameter access processing.
• 'Parameter access request command for the slave module' (Y10)
• 'Parameter batch read command for the slave module' (Y11)
• 'Parameter batch write command for the slave module' (Y12)
■Turning off of 'Parameter accessing flag (with handshake)' (XB)
'Parameter accessing flag (with handshake)' (XB) turns off when both of the following conditions are met.
• The parameter access processing has been completed.
• 'Parameter access request command for the slave module' (Y10), 'Parameter batch read command for the slave module'
(Y11), and 'Parameter batch write command for the slave module' (Y12) are all turned off.
For the completion timing of the parameter access processing, refer to the following.
Page 38 Check of the parameter access completion
APPX
90
Appendix 2 I/O Signals

Advertisement

Table of Contents
loading

This manual is also suitable for:

Melsec iq-r seriesMelsec iq anywireaslink rj51aw12al

Table of Contents