Actions
Delete
When the agent is connected, the Delete function will not work correctly because the agent will keep
on trying to re-connect.
So connect to the software, remove the Network module from the Software nodes list (in the nodes
list, right click on the Network module and click remove nodes).
When communication with the agent is lost, agent can be deleted by using the Delete button.
Select an agent and press the Delete button to delete the agent.
2.7.3 Agent settings
Agent shutdown sequence timing
All agents that are connected to the Network Module are displayed in tables by power sources.
• Primary
• Group 1
• Group 2
The 'local agent' setting is used for setting for example a minimum shutdown duration, or a power down
delay for a load segment that has no registered shutdown agents. One use case would be a load segment
that powers network equipment that needs to stay on while servers and storage perform their orderly
shutdown.
The tables include the following details:
• Name
• Delay (in s)
• OS shutdown duration (in s)
Actions
Set Delay
Select and directly change the setting in the table and then Save.
Set OS shutdown duration
Select and directly change the setting in the table and then Save.
Examples
Examples below show the impact of agent settings on the shutdown sequence for an ordered shutdown
or an immediate shutdown.
Agent settings examples
Sequential shutdown
Immediate shutdown