Powering down/up applications (examples)
For examples of Power outage policy, see the following sections:
•
Maximize availability policy example
•
Immediate graceful shutdown policy example
•
Load shedding policy examples
•
Custom policy examples
2. Enable policies of Primary, Group 1 and Group 2.
3. Set Primary and Group 1 to: custom policy and set it to end shutdown sequence 180s before the end of
backup time.
Critical equipment is the last one to power down, their availability will be maximized and their shutdown
will end 180s before the end of backup time.
4. Set Group 2 to: immediate graceful shutdown policy.
Non-priority equipment immediately shuts down when on battery for 10s to keep battery power for
critical equipment.