Installation - Keysight E5052B Installation Manual

Signal source analyzer
Hide thumbs Also See for E5052B:
Table of Contents

Advertisement

Keysight E5052B Signal Source Analyzer
Installation Guide
2

Installation

This chapter provides information about how to set up the Keysight E5052B.
Contents of this
Chapter
o
o
o
o
o
o
o
"Checking the Shipment" on page 12
After you receive the analyzer, check all the items in the packing container.
"Environmental Requirements" on page 13
Describes the system requirements needed to install the E5052B and how to
secure space for heat radiation.
"Installing Front Handles/Rack Mounting Flanges" on page 16
Shows how to mount the front handles used to transport the E5052B and how
to install the flanges needed to install it in a rack.
"Connecting the Accessories" on page 19
Provides information for connecting the mouse, keyboard, BNC adaptor to the
E5052B.
"Power Supply" on page 20
Shows how to check the power supply as well as check and connect the power
cable.
"Starting the E5052B" on page 23
Describes turning on/off of the Power switch and cutting off the power supply.
"Initial Registration of E5052B" on page 26
Provides the procedure of initial registration for the Windows operating system
of the E5052B.
11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents