Controller Operations
Header
5. Enter the actual measured height of the feedgate
in the display. Press
6. The feedgate will now move to its maximum
height. Press
7. Measure the actual height of the feedgate from
the conveyor as shown by measurement B.
NOTE: Maximum height setting of feedgate is higher
than actual feedgate opening. Ensure measurement
taken is from the bottom edge of the feedgate to the
conveyor.
8. Enter the actual measured height of the feedgate
in the display. Press
www.New-Leader.com
(800) 363-1771
to continue.
to continue.
to continue.
- 97 -
NL5258G5/NL5300G5
B B B B
314732-AA-B