Insert Installation
Header
Recommended sequence of installation is:
1.
Spreader preparation.
2.
Insert preparation.
3.
Mounting of insert.
4.
Connecting hydraulic hoses.
5.
Installation of hillside divider and conveyor cover.
6.
Checking installation.
7.
Checking for leaks and proper functioning.
INSERT HYDRAULIC REQUIREMENTS
Refer to "Spreader Hydraulic Requirements" for specifi cations required for insert installation.
SPREADER PREPARATION
WARNING
1. Remove the Inverted "V", Hillside Divider and side
boards from the spreader, if so equipped, and set
hardware aside. Replace chain shield hardware from
Hillside Divider and torque to spec.
2. Figure 1 - Disconnect feedgate hydraulic hoses (A).
3. Figure 2 - Disconnect Endgate harness at rear
electrical bulkhead. Uncap all necessary receptacles.
www.New-Leader.com
(800) 363-1771
Use only lifting devices that meet or exceed OSHA standard 1910.184. Never exceed
work load limits or lift equipment over people. Empty spreader before lifting. Loads may
shift or fall if improperly supported, causing injury.
A
A
B
B
BIN 1
BIN 2
BIN 2
BIN 3
- 29 -
NL5258G5/NL5300G5
Figure 1
Figure 2
314732-AA-B