New Leader AGCO NL5258G5 Operator's Manual page 100

Hopper type spreaders
Table of Contents

Advertisement

Header
Controller Operations
Using the control buttons
Run, Stop), run a catch test. If spreading product that
has already been tested, press
begin a test, press
Once controller dispenses specifi c amount,
conveyor will stop. Press
Weigh material dispensed and enter actual
weight of material dispensed. Press
It is recommended a minimum of three (3) tests be
done PER PRODUCT to ensure accuracy. Once
each test is done, press "Repeat Calibration" to
run a subsequent test. When fi nished, press
The main Calibration screen will appear. To
calibrate with a known amount brought to a fi eld,
press
Field totals can be reset from Summary
Note:
Screen if needed.
314732-AA-B
to continue. To
. Conveyor will run.
to continue.
.
(Reset,
to continue.
.
- 100 -
NL5258G5/NL5300G5
www.New-Leader.com
(800) 363-1771

Advertisement

Table of Contents
loading

This manual is also suitable for:

Agco nl5300g5

Table of Contents