Conduit Entry - Ingeteam Ingecon Sun Smart U Installation And Operation Manual

Table of Contents

Advertisement

Installation and Operation Manual
INGECON®SUN SMART U
AAS2000IKI05
+
PV Input
-
One of the two
fuses has to be
installed
2.5

Conduit Entry

DC grounding
DC input
35(1
/
)
41(1
1
4
AAS2000IKI05
Rev. _
Date: February 2011
INGECON SUN 25 U 480V
Only the hot pole
Inverter
have the fuse
installed
3
Fused
disconnect
switch
DC voltage
surge arresters
The
INGECON SUN SMART U
conduits. On the base of the enclosure there are several knockouts designed
to be opened and lodge a conduit.
Don't open any knockout that won't be used. It could affect to NEMA degree.
Knockouts have been designed to be used in wiring as picture shows. For
a different use first ask INGETEAM.
view of the base
of the enclosure
DC input
/
)
41(1
/
)
1
1
2
2
Contactor
Transformer
Fuses
AC voltage
surge arresters
Enclosure and other
metal parts, always
Grounded.
wires musst go through the enclusure by
GROUNDING /AUX
16(1
/
)
16(1
/
)
1
1
2
2
Breaker
3 X 480 Vac
60 Hz
Neutral
N MOV's
16(1
/
)
1
2
COM. INPUT
AC input
/ AUX
41(1
/
)
1
16(1
/
)
1
2
2
Page 27

Advertisement

Table of Contents
loading

Table of Contents