Checking Battery Voltage

1. Refer To Figure 3, and PRESS and HOLD the
battery switch in the "OPTION" position. The
following shall occur:
• The green LED shall illuminate to indicate that
the battery pack is fully charged.
• The yellow LED shall illuminate to indicate that
the battery is partially drained.

Adjusting Door Spring Tension

NOTE: The doors are shipped with spring tension set
to one half of the maximum spring tension.
1. Manually OPEN AND CLOSE the door several
times. ENSURE that the door opens and closes
smoothly.
2. If the spring tension needs to be adjusted, refer to
Figure 32, and ADJUST door-open spring tension
as follows:
NOTE: CLOCKWISE
ROTATION INCREASES
SPRING TENSION
Figure 34
• The red LED shall illuminate to indicate that
the battery pack is fully drained and the door
operator will not function in the automatic
mode.
a. INSERT 3/16" hex wrench into spring tension
setscrew.
• If the door feels too light, using the 3/16"
hex wrench, TURN the setscrew in the end
of the operator clockwise to increase
spring tension.
• If the door feels too heavy, using 3/16" hex
wrench, TURN the setscrew in the end of
the operator counterclockwise to
decrease spring tension.