Measuring With The Rack Template; Installing The Rack Rails For A Square-Hole Rack - HPE Synergy 12000 Frame Setup And Installation Manual

Hide thumbs Also See for Synergy 12000 Frame:
Table of Contents

Advertisement

Procedure
1. Remove components from the frame.
2. Use the rack template to mark the locations for the rack rails.
3. Install the rack rails and cage nuts for each frame.
For more information, see the appropriate section according to the type of rack being used.
4. Install the frame into the rack.
5. Complete the component installation for your configuration.

Measuring with the rack template

The HP Synergy 12000 Frame Rack Template ships with the frame and provides detailed instructions on
where to position the frame and rack rails, and where to install the cage or clip nuts. Each frame kit
includes the rack rails recommended for that frame.
NOTE: Four cage nuts and four clip nuts are included with the frame. Cage nuts should be used in racks
with square holes. Clip nuts should be used in racks with round holes.
When installing multiple frames, install the rack rails and cage nuts for one frame, and then install the
frame. Repeat for each additional frame.
Procedure
1. Install lower cage nuts (left and right) in the front of the rack at the bottom of the fourth U (10 holes up
on the template).
2. Install the upper cage nuts (left and right) in the front of the rack at the bottom of the tenth U (28 holes
up on the template).
3. Install the rack rails.

Installing the rack rails for a square-hole rack

Rack rails are marked "LEFT" and "RIGHT" for identification. The rail release levers are used only when
removing the rail from the rack.
28
Measuring with the rack template

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents