Mira event Installation, Operation, Maintenance Manual page 17

Manual all-in-one power shower
Table of Contents

Advertisement

1.4.
Using a spirit level position
the appliance on the wall,
then mark through the three
fixing points.
Tip! Special consideration
should be given to the fixing
arrangements when installing
on to a dry lined, stud
partition or dry partition wall
structure. Installers may wish
to obtain alternative
proprietary cavity fixings, or
choose other options such as
fabricating rear supports
using wooden blocks,
however, these methods of
fixing are beyond the scope
of this guide.
Important! This Mira Event
must be fixed to the wall at
all three fixing positions.
The fixing holes are
elongated to assist in vertical
and horizontal alignment.
1.5.
Drill and plug the wall.
Caution! Avoid buried
cables and pipes!
1.6.
Cut away and trim the
thinned section in the top of
the case to allow the
electrical supply cable to run
down the back of the case.
17

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents