Schematic Installation Diagrams - Mira event Installation, Operation, Maintenance Manual

Manual all-in-one power shower
Table of Contents

Advertisement

4. Schematic Installation Diagrams

25mm
minimum
Cistern
Minimum
1.0m head
Minimum
Ø22mm
D.H.W.
60
Isolating valve
Cistern
Other cold
*
draw offs
*
D.H.W.
60
Other hot draw offs
A
Warning pipe
Vent
pipe
B
o
C
Hot supply
Other hot draw offs
Schematic Installation - Correct
hot feed pipe runs
(may cause air locking)
Vent
pipe
*
*
Side
This layout is not suitable
entry
o
C
for the Mira Event
boss
Schematic Installation - Incorrect
Minimum
75mm head
Hose
retaining
ring
Avoid high-level
Isolating valves
Hot
supply
Cold
supply
* Incorrect supply
connections
13
A
Cylinder Feed
Cold Pump Feed
B
o
30
o
60
missing
Hose retaining
ring missing
(see Water Byelaws)
Strained hose
Warning
pipe
Vent
90
o

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents