Pump Assembly Renewal - Mira event Installation, Operation, Maintenance Manual

Manual all-in-one power shower
Table of Contents

Advertisement

6.8.
Refit the flexible hose.
6.9.
Prime the pump, refer to
"Commissioning: Priming
the Appliance". The
adjustable maximum
temperature will also require
to be reset, refer to
"Adjustable Maximum
Temperature Setting".
6.10. Restore the electrical
supplies.

7. Pump Assembly Renewal

The following procedure can be applied for cleaning or replacing the pump
assembly.
Warning! Isolate the electrical and water supply to the appliance before
proceeding.
7.1.
Use the push-fit release tool
to lever off the flow knob,
indicator trim and
temperature knob. Unscrew
the cover retaining screw
and remove the cover by
pulling the bottom of the
cover in an outward and
upward direction.
7.2.
Disconnect pump electrical
supply wiring from the pump
assembly and the earth wire
from the earth stud on the
pcb.
Cover
retaining
screw
38
Hose washer
Flexible hose
Temperature
knob
Flow knob
Indicator trim

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents