Change The Inlet Supply Ports - Mira event Installation, Operation, Maintenance Manual

Manual all-in-one power shower
Table of Contents

Advertisement

6. Change the Inlet Supply Ports

Flow knob
Cover
retaining
screw
6.1.
Indicator
trim
6.2.
Temperature
knob
6.3.
Blanking
plugs
Release
tool
6.4.
6.5.
Inlet
manifold
15
This procedure changes the
blanking plug positions to
allow for a top or back inlet
supply configuration.
Use the push-fit release tool
(supplied) to lever off the flow
knob, indicator trim and
temperature knob.
Note! Use of a screwdriver
will damage the knobs and
the cover assembly.
Unscrew the cover retaining
screw and remove the cover
by pulling the bottom of the
cover in an outward and
upward direction
Remove the inlet blanking
plate as appropriate.
Insert the push-fit release
tool between the flange of
each of the blanking plugs
and the grey collet of the inlet
manifold, and lever the plugs
outward.
Whilst holding back on the
collet, pull out each
appropriate blanking plug by
hand.
Install the two blanking plugs
in the manifold bottom inlets.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents