Power Management; Power-On Process; Figure 2-10: Arcvault Basic Cabling; Figure 2-11: Power-On Points - Overland Storage ARCvault Series Service Manual

Autoloader/library
Hide thumbs Also See for ARCvault Series:
Table of Contents

Advertisement

1. Connect the LVD SCSI cable to one of the SCSI ports and the other end to your system.
2. Attach the SCSI terminator to the remaining open SCSI port.
3. Plug the host network connection into the Ethernet port.
4. Plug the power cord into the AC receptacle and the other end into a power source.

2.3 Power Management

While powering on the unit, holding the rear Power button more than 10 seconds will put the unit
into a maintenance mode. To exit the maintenance mode, recycle the power normally.

2.3.1 Power-On Process

1. Verify the power cord is plugged in.
2. Start the power-on process
• From the front, tap the OCP.
• From the rear, press and release the Power switch.
10400025-101 10/2006
SCSI Cable
SCSI Terminator

Figure 2-10: ARCvault Basic Cabling

WARNING: Neither the touch screen nor the power switch completely shuts off power to the unit.
To reduce the risk of electrical shock or damage to the equipment, remove the power cord.
Front: Tap Here

Figure 2-11: Power-On Points

(Figure
Ethernet
2-11).
System Overview
Power Cord
Rear: Press Here
2– 7

Advertisement

Table of Contents
loading

Table of Contents