Tie-Down Reinstallation For Shipment; Figure 2-2: Tie-Down Removal - Overland Storage ARCvault Series Service Manual

Autoloader/library
Hide thumbs Also See for ARCvault Series:
Table of Contents

Advertisement

Section 2
4. Using the wire end closest to the front, gently pull the wire out.
If necessary, feed the other wire end up into the unit as you pull out the front end.
5. Save the tie-down wire in case you ever need to ship the unit.

2.1.1.2 Tie-Down Reinstallation for Shipment

CAUTION: Do NOT turn the library upside down onto its top or allow the front bezel to contact the table if on
its side.
1. Remove and retain the six screws from the front top cover of the empty chassis.
2. Lift the front edge of the cover and pull it slightly forward to release the tabs in the rear. Set
the cover aside.
3. Verify that the shuttle is in the Home position (facing the bottom front slot of the right
magazine).
IMPORTANT: If the shuttle is not in the Home position, contact Overland Technical Support.
4. Position the library so there is space underneath the front 8 inches (20cm) of the unit.
This allows room for the tie-down to exit the chassis and be twisted together.
5. Insert one end of the saved tie-down into the front tie-down hole and the other end into the
rear tie-down hole
Route the tie-down wire between the black motor cable and the body of the shuttle.
2–2
Pull Out

Figure 2-2: Tie-Down Removal

WARNING: To reduce the risk of electric shock or damage to equipment, disconnect the power
by unplugging the power cord.
(Figure
2-3).
Push In
10400025-101 10/2006

Advertisement

Table of Contents
loading

Table of Contents