Restart Communication Between The Bus Node And The Device; Check Fieldbus Communication - Festo CTEU-CO Manual, Functions And Maintenance

Universal bus node
Table of Contents

Advertisement

3. Error treatment
Error status 2

3.1.3 Restart communication between the bus node and the device

Problem description:
Remedy:

3.1.4 Check fieldbus communication

Festo P.BE-CTEU-CO-OP+MAINT-EN en 1101NH
The load voltage supply for the connected device(s) is miss-
ing or exhibits undervoltage:
PS-LED flashes green and
X1 and/or X2-LED flash green
Prerequisite: That connected device(s) must support this
diagnostic function (see device description).
X1 and X2 flash red simultaneously despite checking the
mechanical connection between the bus node and the device
(disassembly -> assembly)
Proceed as follows:
1. Disconnect the operating voltage.
2. Check the assembly and/or re-establish the cable connec-
tion between the bus node and connected devices.
3. Switch voltage on again.
X1 and/or illuminate or flash green.
Compare the desired baud rate with the baud rate set on
the bus node (DIL switch setting).
Compare the desired Node ID with the Node ID set on the
bus node (DIL switch setting).
Information relating to installing the bus node can be found in
Part I of the product documentation entitled "Installation and
Interface manual", which is supplied with the bus node.
3-5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents