Connecting Power Wiring For 22 Kw System Modules - Allen-Bradley 1394 SERCOS Installation Manual

Multi-axis motion control system
Hide thumbs Also See for 1394 SERCOS:
Table of Contents

Advertisement

Allen-Bradley PLCs
Connecting Your 1394 SERCOS Interface System
5. Insert the incoming 24V control power wires into the logic power
connector plug as follows and tighten the connector plug screws.
Insert the
Into connector plug
wires labeled:
terminals labeled:
W1
W1
W2
W2
6. Gently pull on each wire to make sure it does not come out of its
terminal. Re-insert and tighten any loose wires.
7. Insert the logic power connector plug into the logic power
connector (refer to Figure 2.10 for connector location).
8. Go to Connecting Motor Power to Axis Modules.

Connecting Power Wiring for 22 kW System Modules

To connect power wiring:
1. Connect the system module ground wire from the system module
single point bond bar to the bonded ground bar or bonded
cabinet ground bus on the subpanel (as shown in Figure 2.7). For
more information on bonding, refer to the chapter Installing Your
1394 SERCOS Interface System.
2. Open the front door of the system module and locate the 22 kW
system module terminal blocks (refer to Figure 2.11).
3. Insert the incoming power wires into the terminal blocks as
follows and tighten the four terminal block screws.
Insert the
Into the terminal
wires labeled:
blocks labeled:
U
U
V
V
W
W
Ground
PE
Tighten to this
torque value:
0.56-0.62 N-m
(5.0-5.6 lb-in.)
Tighten to this
torque value:
2.21 - 2.66 N-m
(20.0 - 24.0 lb-in.)
Publication 1394-5.20 — July 2001
2-15

Advertisement

Table of Contents
loading

This manual is also suitable for:

1394c-sjt05-d1394c-sjt10-d1394c-sjt22-d

Table of Contents