Chapter Objectives
Allen-Bradley PLCs
Installing Your 1394 SERCOS Interface
System
This chapter covers the following topics:
•
Complying with European Union directives
•
Before mounting your system
•
Unpacking your modules
•
System mounting requirements
•
Bonding your system
•
Mounting your 1394 SERCOS interface system
•
Mounting the external shunt resistor for 5 and 10 kW system
modules
•
Mounting external shunt modules for 22 kW system modules
The following information is a guideline for
ATTENTION
proper installation. The National Electrical Code
and any other governing regional or local
!
codes overrule this information. The Allen-
Bradley Company cannot assume responsibility
for the compliance or the noncompliance with
any code, national, local or otherwise, for the
proper installation of this system or associated
equipment. If you ignore codes during
installation, hazard of personal injury and/or
equipment damage exists.
1
Chapter
Publication 1394-5.20 — July 2001