System Mounting Requirements - Allen-Bradley 1394 SERCOS Installation Manual

Multi-axis motion control system
Hide thumbs Also See for 1394 SERCOS:
Table of Contents

Advertisement

1-4
Installing Your 1394 SERCOS Interface System
System Mounting
Requirements
Publication 1394-5.20 — July 2001
Remove all packing material, wedges, and braces from within and
around the components. After unpacking, check the item(s)
nameplate catalog number against the purchase order. Refer to
Appendix C for more information on catalog numbers.
There are several things that you need to take into account when
preparing to mount the 1394:
The ambient temperature of the location in which you will install
the 1394 must not exceed Environmental Specifications as shown
in Appendix A.
You must install the panel on a flat, rigid, vertical surface that
won't be subjected to shock, vibration, moisture, oil mist, dust, or
corrosive vapors.
You have to mount the system vertically.
You need to maintain minimum clearances (see Figure 1.1) for
proper airflow, easy module access, and proper cable bend radius.
Refer to Appendix A for mounting dimensions, power dissipation, and
environmental specifications for the 1394.
This drive contains ESD (Electrostatic Discharge)
ATTENTION
sensitive parts and assemblies. You are required to
follow static control precautions when you install,
!
test, service, or repair this assembly. If you do not
follow ESD control procedures, components can be
damaged. If you are not familiar with static control
procedures, refer to Allen-Bradley publication 8000-
4.5.2, Guarding Against Electrostatic Damage or
any other applicable ESD Protection Handbook.

Advertisement

Table of Contents
loading

This manual is also suitable for:

1394c-sjt05-d1394c-sjt10-d1394c-sjt22-d

Table of Contents