Commissioning
12
3
Commissioning
3.1
Scope of delivery
MeterMulti 9620 IDS
USB cable (A plug on mini B plug)
Power pack
Stand with stand base
Short instructions
Comprehensive operating manual (4 languages)
CD-ROM
3.2
Power supply
The Multi 9620 IDS is supplied with power in the following ways:
Mains operation with the supplied power pack
In the case of power failure:
The system clock is operated via a buffer battery (see section 14.1.2
E
XCHANGING THE BATTERY
3.3
Initial commissioning
Perform the following activities:
Connect the power pack
(see section 3.3.1 C
Switch on the meter (see section 4.2 S
Set the date and time (see section 4.5.5 E
THE DATE AND TIME
Mount the stand
(see operating manual of the stand)
, page 123).
ONNECTING THE POWER PACK
WITCHING ON THE METER
, page 25)
®
inoLab
Multi 9620 IDS
, page 13)
2
XAMPLE
ON NAVIGATION
ba77173e04
, page 19)
: S
ETTING
12/2017
Need help?
Do you have a question about the inoLab Multi 9620 IDS and is the answer not in the manual?