Commissioning; Scope Of Delivery; Power Supply; Initial Commissioning - wtw inoLab Multi 9620 IDS Operating Manual

Digital meter for ids sensors
Table of Contents

Advertisement

Commissioning

12
3
Commissioning
3.1

Scope of delivery

 MeterMulti 9620 IDS
 USB cable (A plug on mini B plug)
 Power pack
 Stand with stand base
 Short instructions
 Comprehensive operating manual (4 languages)
 CD-ROM
3.2

Power supply

The Multi 9620 IDS is supplied with power in the following ways:
 Mains operation with the supplied power pack
 In the case of power failure:
The system clock is operated via a buffer battery (see section 14.1.2
E
XCHANGING THE BATTERY
3.3

Initial commissioning

Perform the following activities:
 Connect the power pack
(see section 3.3.1 C
 Switch on the meter (see section 4.2 S
 Set the date and time (see section 4.5.5 E
THE DATE AND TIME
 Mount the stand
(see operating manual of the stand)
, page 123).
ONNECTING THE POWER PACK
WITCHING ON THE METER
, page 25)
®
inoLab
Multi 9620 IDS
, page 13)
2
XAMPLE
ON NAVIGATION
ba77173e04
, page 19)
: S
ETTING
12/2017

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the inoLab Multi 9620 IDS and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Inolab multi 9630 ids

Table of Contents