Tle Series 600 - Power Connection With Common Mains Input - GE TLE series 600 User Manual

600 and 800 kva 400vac ce s1
Table of Contents

Advertisement

5.9.1 TLE Series 600 - Power connection with Common Mains Input

Fig. 5.9.1-1 TLE Series 600 - Power connection with common Mains Input
Power connection cables are connected to bus bars using M12 bolts.
The bolts of the connection cables must be tightened with a torque wrench at 60 Nm.
Fix the cables on accessory "A" with the enclosed cable ties.
L1-1
Rectifier + Bypass Phase L1
L2-1
Rectifier + Bypass Phase L2
L3-1
Rectifier + Bypass Phase L3
NOTE !
The interconnection links BR1, BR2 and BR3 on the input bus bars MUST REMAIN
CONNECTED (see Fig. 5.9.1-1).
L1
Load phase L1
N
Load Neutral
+
Positive pole of the battery
-
Negative pole of the battery
PE
Battery cabinet ground
Bolt Size / Torque: M10 / 40 Nm
DANGER !
Before closing the "External Battery Fuses", verify for correct polarity of the External
Battery connection.
NOTE !
To meet standards concerning electromagnetic compliance, the connection
between the UPS and external Battery must be done by using a shielded cable or
suitable shielded (steel) conduit!
This UPS is only designed to operate in a wye-configured electrical system with a
solidly grounded neutral.
If the UPS is equipped with an input bypass transformer, the secondary of the
transformer must be wye-configured with neutral solidly grounded.
Modifications reserved
GE_UPS_OPM_TLE_SCE_M60_M80_1GB_V020.docx
INTERCONNECTIONS LINKS
BR1, BR2 and BR3
MUST REMAIN CONNECTED
Q1
A
Common Mains Input - Rectifier / Bypass
Output Load
L2
PE
External Battery connection
Critical Power
!
1
Rectifier
Mains
BR3
Load
L3
L3-1
BR2
Load
L2
BR1
Load
L1
Position of the bus bars for
cables input from the top of the UPS (see Section 5.9)
Load phase L2
Load Ground
Power Section cabinet
Typical installation
using common NEMA
Typical installation
using common NEMA
two hole lugs
N
Mains Neutral
Load Neutral
L2-1
N
Mains Neutral
Load Neutral
L1-1
N
Mains Neutral
PE
Mains Ground
L3
Load phase L3
In/Out Section cabinet
+
_
two hole lugs
PE
User Manual TLE Series 600 & 800 CE S1
PE
Page 55/146