Tle Series 800 - Power Connection With Separate Mains Input - GE TLE series 600 User Manual

600 and 800 kva 400vac ce s1
Table of Contents

Advertisement

5.9.4 TLE Series 800 - Power connection with Separate Mains Input

NOTE !
Connect a single input Neutral to Bypass Mains (inside the UPS, common Neutral
for Bypass and Rectifier).
Fig. 5.9.4-1 TLE Series 800 - Power connection with Separate Mains Input
Power connection cables are connected to bus bars using M12 bolts.
The bolts of the connection cables must be tightened with a torque wrench at 60 Nm.
Fix the cables on accessory "A" with the enclosed cable ties.
L1-1
Rectifier phase L1
L2-1
Rectifier phase L2
L3-1
Rectifier phase L3
PE
Mains Ground
NOTE !
In this case, the interconnection links BR1, BR2 and BR3 on the input bus bars MUST
BE REMOVED. See Fig. 5.9.4-2.
L1
Load phase L1
N
Load Neutral
+
Positive pole of the battery
-
Negative pole of the battery
PE
Battery cabinet ground
Bolt Size / Torque: M10 / 40 Nm
DANGER !
Before closing the "External Battery Fuses", verify for correct polarity of the External
Battery connection.
Modifications reserved
GE_UPS_OPM_TLE_SCE_M60_M80_1GB_V020.docx
Critical Power
!
INTERCONNECTIONS LINKS
BR1, BR2 and BR3
MUST BE REMOVED
(see Fig 5.9.4-2)
Q1
A
Separate Mains Input - Rectifier / Bypass
Output Load
L2
Load phase L2
PE
Load Ground
External Battery connection
1
2
Rectifier
Bypass
Mains
Mains
Load
L3
L3-1
L3-2
Load
L2
L2-1
L2-2
Load
L1
L1-2
Position of the bus bars for
cables input from the top of the UPS (see Section 5.9)
L1-2
L2-2
L3-2
N
Power Section cabinet
_
Typical installation
using common NEMA
two hole lugs
Typical installation
using common NEMA
two hole lugs
N
Mains Neutral
Load Neutral
PE
N
Mains Neutral
Load Neutral
L1-1
Bypass phase L1
Bypass phase L2
Bypass phase L3
Mains Neutral (Bypass)
L3
Load phase L3
In/Out Section cabinet
+
PE
Page 59/146
User Manual TLE Series 600 & 800 CE S1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tle series 800

Table of Contents