Download Print this page

GE 700 VA Installation Manual

Uninterruptible power supply on-line vh series ups 700 - 1000 - 1500 - 2000 - 3000 va

Advertisement

GE
Digital Energy
Firmware Update
Installation Guide
Digital Energy™ Uninterruptible Power Supply
On-line VH Series UPS
700 - 1000 - 1500 - 2000 - 3000 VA
GE Consumer & Industrial SA
General Electric Company
CH – 6595 Riazzino (Locarno)
Switzerland
T +41 (0)91 / 850 51 51
F +41 (0)91 / 850 51 44
www.gedigitalenergy.com

Advertisement

loading

Summary of Contents for GE 700 VA

  • Page 1 Installation Guide Digital Energy™ Uninterruptible Power Supply On-line VH Series UPS 700 - 1000 - 1500 - 2000 - 3000 VA GE Consumer & Industrial SA General Electric Company CH – 6595 Riazzino (Locarno) Switzerland T +41 (0)91 / 850 51 51 F +41 (0)91 / 850 51 44 www.gedigitalenergy.com...
  • Page 2: Table Of Contents

    Contents Safety rules ........................3 Introduction ........................3 Switching off and unplug the battery..............4 Remove top cover of the UPS................. 5 Remove dangerous voltage ..................6 Unplug the control board..................8 Programmer plug-in....................9 Firmware update .......................11 Closing and testing....................13 Modifications reserved ISG_VHS_FRM_UPD_XGB_V010.doc...
  • Page 3: Safety Rules

    GE refuses any responsibility in case of non-observance, unauthorized alterations or improper use of the delivered UPS. While every care has been taken to ensure the completeness and accuracy of this manual, GE accepts no responsibility or liability for any loss or damage resulting from the use of the information contained in this document.
  • Page 4: Switching Off And Unplug The Battery

    3 Switching off and unplug the battery • Press keypad ‘O’ for 1 second to switch off the UPS then disconnect the mains cable. • Pull out the lower part of the front panel to remove it. • Disconnect the DC connector of the internal batteries, then press the keypad ‘I ’ to discharge the capacitors. Modifications reserved ISG_VHS_FRM_UPD_XGB_V010.doc...
  • Page 5: Remove Top Cover Of The Ups

    4 Remove top cover of the UPS • Place the UPS horizontally on a table or desk. • Remove the 3 screws how indicated on the picture. • Slide out the cover in the indicated direction and Pull up the cover to remove it from the UPS. Modifications reserved ISG_VHS_FRM_UPD_XGB_V010.doc...
  • Page 6: Remove Dangerous Voltage

    5 Remove dangerous voltage CAUTION To avoid damage due to ESD (ElectroStatic Discharge) be sure that maintenance work is performed under ESD-safe conditions: work on an anti-static mat; ground yourself and the unit when it is opened. CAUTION When the UPS is uncovered use the proper caution to not damage the board and all the electrical parts.
  • Page 7 • Procedure: • Shut the UPS down by pressing key ‘0’ on the Operating panel. • Remove Mains voltage from the input socket. • Remove the Front Panel and disconnect the Battery plug. • Wait 10 Minutes to allow discharge of the DC-Capacitors. •...
  • Page 8: Unplug The Control Board

    6 Unplug the control board • Remove the 3 cables and the small board how indicated on the picture. • Remove the 2 screws that keep the lock tab for the control board. • Slide up the control board out of the VH cabinet. Modifications reserved ISG_VHS_FRM_UPD_XGB_V010.doc...
  • Page 9: Programmer Plug-In

    7 Programmer plug-in Top view of the VH Prog. Board Top view of the E8a Programmer Top view of the IM0128A5 Board • Insert the J1 connector of the VH Prog. Board in mid-position of J4 connector of the IM0128A5. NOTE: Pay attention that J1 pins are correctly fixed on J4 connector.
  • Page 10 • Insert the flat cable on J2 connector of the VH Prog. Board. Fig. 2 • Connect USB and the flat cable to the E8a Programmer. Fig. 3 • Top view of the final cabling for the firmware update with the VH Programming Board for Digital Energy™...
  • Page 11: Firmware Update

    8 Firmware update • Download and Install HEW tool from renesas homepage (if not already installed). Open the folder where you placed the Software Update. Double click on the File named: VHSeriesV6RX.hws (Where X is the firmware version). HEW tool will automatically open. •...
  • Page 12 • Confirm Upload by pressing OK buttons. • Then Disconnect if you desire to program more than one Unit or exit if programming procedure is finished. • Once that the UPS has been replaced and E8a is connected to the new Control board, connect again by pressing Connect button (as shown in following picture) and restart from point 1.
  • Page 13 9 Testing and closing • Run UPS Configuration tool to check if the new firmware it is correctly installed. • Slide in the control board into the VH cabinet. Modifications reserved ISG_VHS_FRM_UPD_XGB_V010.doc...
  • Page 14 • Lock the 2 screws that keep the lock tab for the control board. • Reconnect the 3 cables and the small board on the control board how indicated in the picture. • Put the cover on the VH cabinet and Slide in the cover on the indicated direction. Modifications reserved ISG_VHS_FRM_UPD_XGB_V010.doc...
  • Page 15 • Lock the 3 screws how indicated on the picture. • Reconnect the DC connector of the internal batteries. • Pull in the lower part of the front panel to cover it. • The UPS it is now ready to operate. Modifications reserved ISG_VHS_FRM_UPD_XGB_V010.doc...
  • Page 16 GE Consumer & Industrial SA General Electric Company CH – 6595 Riazzino (Locarno) Switzerland GE imagination at work T +41 (0)91 / 850 51 51 F +41 (0)91 / 850 51 44 www.gedigitalenergy.com Modifications reserved ISG_VHS_FRM_UPD_XGB_V010.doc...