Inter Cabinet Connections; Cabinets Positioning And Interconnection - GE TLE series 600 User Manual

600 and 800 kva 400vac ce s1
Table of Contents

Advertisement

5.7

INTER CABINET CONNECTIONS

5.7.1 Cabinets positioning and interconnection

NOTE !
The "Power Section cabinet" and "In/Out Section cabinet" must be installed on
leveled floor.
TLE Series 600 - Cabinets positioning and interconnection
Fixing type 3a
Power Section cabinet
Fixing type 3b
Fig. 5.7.1-1 TLE Series 600 – Cabinets positioning and interconnection
Modifications reserved
GE_UPS_OPM_TLE_SCE_M60_M80_1GB_V020.docx
6 Bolt M6x12
8 Bolt M6x12
3a 2
3b 1
6 Bolt M6x12
Critical Power
Fixing type 2
In/Out Section cabinet
Fixing type 1 (2 pc.)
8 Bolt M6x12
from base
TLE
Series
600,
standard
version,
delivered split into two
cabinets, "Power Section
cabinet"
and
"In/Out
Section cabinet".
Align them together with
the
"Power
Section
cabinet" on the left side
(cabinet
with
Control
Panel).
See Fig. 5.7.1-1.
Pay attention, that no
loose cables are trapped
when
pushing
cabinets together.
Once finally positioned,
the two cabinets have to
be connected together
with power and control
wiring.
Refer to Section 5.7.2 and
5.7.3.
Page 38/146
User Manual TLE Series 600 & 800 CE S1
in
is
the

Advertisement

Table of Contents
loading

This manual is also suitable for:

Tle series 800

Table of Contents