Vertical Vent Termination
Roof
Minimum
Pitch
"H" (feet)
Flat to 7/12
1'
Over 7/12 to
1.5'
8/12
Over 8/12 to
2'
9/12
Over 9/12 to
2.5'
10/12
Over 10/12 to
3.25'
11/12
Over 11/12 to
4'
12/12
Over 12/12 to
5'
14/12
Installer—READ THIS FIRST
Only qualifi ed licensed or trained personnel
should install this appliance.
1. YOU NEED TO KNOW FROM THE
HOMEOWNER:
- The height of the unit and hearth if used;
- The thickness and type of the wall fi nish
around the appliance;
- What accessories (shelf, underbed lighting,
etc.) will be installed with this fi replace;
- The venting confi guration - 4 x 6-5/8 or 5 x 8
2. Unpack the appliance but keep the barrier screen
in its packaging to protect it; recycle the packaging.
3. Remove the bottom plate in front of the window.
4. Remove the window and all items inside the
fi rebox.
5. Check that you have everything, using the Pack
Content sheet. Also, check that you have:
◊ a fuel bed (packed separately)
◊ a set of liners (packed separately)
◊ Remote Battery & Wall Switch Kit RBSWK
◊ LDK HeatShift Duct Kit (mandatory)
◊ Gas conversion kit if necessary
◊ Venting accessories
◊ Electrical accessories
◊ 2200ULK—Underbed Lighting Kit (if used)
VENTING
Horizontal
overhang
Termination
cap
Vertical
Min.
wall
18"
Storm
collar
Roof
flashing
INSTALLATION PLANNING
Overhang should not
extend beyond vent if
within 48" of
termination cap
Min. 24"
(unvented soffit)
Min. 36"
(vented soffit)
'H'
Please note that the LDK HeatShift
Duct Kit MUST be installed on this
appliance!
6. Carefully read the Installer's Checklist included with
the fi replace for the installation sequence.
Please note that the following steps must be done
BEFORE the appliance is placed in its fi nal position
in the cavity since the connections are done from
the back of the appliance:
•
electrical connections
•
gas connections
•
gas conversion (if needed)
•
wiring of the Remote Battery & Wall Switck Kit
RBWSK
QUALIFIED
INSTALLER
Clearance to air inlet to
any other appliance is
min. 12" (30 cm)
39