YASKAWA CIMR-V7AM Technical Manual page 11

V7 ethernet/ip option cm093
Table of Contents

Advertisement

Diagnostic LED Power-up Sequence
A power-up test is performed each time the AC drive is powered-up after the initial boot-up sequence. The initial boot-up sequence may
take several seconds. When this sequence is complete, the LEDs will assume their normal conditions.
Table 1.2 - LED Power-up Sequence
Seq
MS/RUN
1
GREEN
2
RED
3
GREEN
4
GREEN
5
GREEN
6
GREEN
The EtherNet/IP Option Kit is successfully initialized after the LEDs have completed the above sequence.
Successful Initialization
The EtherNet/IP Option Kit hardware is installed and operating correctly with the LEDs in the states shown in bold text in the "LED
Descriptions" table on page 1-7. The LINK LED represents the status of the physical connection to the network and is not indicative of any
card state.
NS/CON
Time
OFF
250ms
OFF
250ms
OFF
250ms
GREEN
250ms
RED
250ms
OFF
Fig 1.4 LED State Description
Installation 1-6

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents