Engine Reinstallation - Suzuki GS1100G 1982 Service Manual

Table of Contents

Advertisement

3-7 SERVICING ENGINE
ENGINE REINSTALLATION
For remounting, reverse the order of engine r e
mova I,
Temporarily fasten the engine mounting bracket
before inserting the engine mounting bolts.
0
After inserzing the engine mounting bolts, tight-
en engine
mourning bracket bolts and engine
mounting bolts. Insert all three long bolts from
the left side.
The
nut @
takes its position
in the
place indi-
cated.
Tightening torque for engine mounting bolts
1
Secure the universal joint flange and propeller
shaft with four bolts
a t
four places. Be sure to
apply THREAD
LOCK SUPER "1 363A"
to the
bolts.
991 04 -
32030
Thread lock super "1 363A"
I
*
Install the propeller shaft boot with the two
Tightening torque
clamps.
Firmly secure the carburetor with the clamps.
If the carburetor is not firmly secured, gas
leakage, incorrect air-fuel ratio and unsatis-
factory engine operation may result.
*
Mount the front footrest and the gearshift lever.
3 . 0
-
4.0
kg-rn
(21.5
- 29.0
I b-ft)

Advertisement

Table of Contents
loading

Table of Contents