Suzuki GS1100G 1982 Service Manual page 292

Table of Contents

Advertisement

10-1 7 GST 1 OQG
t
REASSEMBLY
Reassemble and remount the
front
fork in the
reverse order of disassembly and removal, and also
carry out the following steps:
INNER TUBE METAL
Hold the inner tube vertically and clean the
metal
groove.
Clean the new metal inner surface and install
it to
the metal groove of the inner tube as shown.
Take special care to prevent damage to the
Teflon coated
surface of the Anti-friction
DAMPER ROD BOLT
Apply Thread Lock Cement and SUZUKI BOND
NO. 1215 t o the damper rod bolt. Tighten the
damper rod bolt with specified torque.
99000 -
32040
1
Thread Lock Cement
99104
- 31
110
1
SUZWKl BOND NO. 1215
2.0
-
2.6
kg-rn
Tightening torque
(14,5
- 19.0
Ib-ft)
OIL SEAL
Mounting oil seal by using the special tool as
shown.
I
Thread
Lock Cement
09940
- 501
11
Front fork oil seal installer

Advertisement

Table of Contents
loading

Table of Contents