Engine Reinstallation - Suzuki DR 125 Service Manual

Table of Contents

Advertisement

3-6
ENGINE

ENGINE REINSTALLATION

Reinstall the engine in the reverse order of engine removal.
• Install the engine mounting bolts and nuts as shown in the following illustration.
• Tighten the engine mounting nuts to the specified torque.
NOTE:
The engine mounting nuts are self-locking. Once the nuts have been removed, they are no longer of any
use.
• Tighten the swingarm pivot nut to the specified torque.
" Swingarm pivot nut: 65 N·m (6.5 kgf-m, 47.0 lb-ft)
• Tighten the engine mounting bracket nuts to the specified
torque.
" Engine mounting bracket nut:
40 N·m (4.0 kgf-m, 29.0 lb-ft)
(
kgf . m
ITEM
N·m
)
40
4.0
*
40
4.0
+
40
4.0
lb-ft
29.0
29.0
29.0

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents