Engine Reinstallation - Suzuki GZ250 Service Manual

Hide thumbs Also See for GZ250:
Table of Contents

Advertisement

ENGINE REINSTALLATION

Reinstall the engine in the reverse order of engine removal.
• Install the engine mounting bolts and nuts as shown in the following illustration.
• Tighten the engine mounting nuts to the specified torque.
NOTE:
The engine mounting nuts are self-locking. Once the nuts have been removed, they are no longer of
any use.
• Tighten the swingarm pivot nut to the specified torque.
Swingarm pivot nut: 72 N-m (7.2 kg-m, 52.0 Ib-ft)
• Tighten the frame down tube mounting bolts and nuts to
the specified torque.
Frame down tube mounting bolt/nut: 23 N-m
NOTE;
Apply a small quantity of THREAD LOCK "1303" to the
threads of bolts.
99000-32030: THREAD LOCK SUPER "1303"
(2.3 kg-m, 16.5 Ib-ft)
ITEM
N-m
kg-m
41
4.1
41
4.1
41
4.1
BOLT LENGTH
50 mm (2.0 in)
67 mm (2.6 in)
100 mm (3.9 in)
ENGINE 3-6
Ib-ft
29.5
29.5
29.5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents