Commissioning; Training Of Assembly/Commissioning Staff; Storage Conditions; Installation Conditions - WAGNER Sprint 60 L XE Operating Manual

Sprint xe series manual powder system
Table of Contents

Advertisement

VERSION 05/2017
OPERATING MANUAL
6

COMMISSIONING

6.1

TRAINING OF ASSEMBLY/COMMISSIONING STAFF

The assembly and commissioning staff must have the technical skills to safely commission
the device.
When assembling, commissioning and carrying out all work, read and follow the
operating manuals and safety regulations for the additionally required system
components.
A skilled person must check to ensure that the device is in a reliable state after it is installed
and commissioned.
6.2

STORAGE CONDITIONS

Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms.
The air temperature at the storage location must be between -20 °C and +60 °C (-4 °F and
+140 °F).
The relative air humidity at the storage location must be between 10 and 95% (without
condensation).
6.3

INSTALLATION CONDITIONS

The air temperature at the installation site must be in a range between 0 °C and 40 °C; 32
°F and 104 °F.
The relative air humidity at the installation site must be between 10 and 95% (without
condensation).
ORDER NUMBER DOC 2354920
SPRINT XE
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sprint airfluid xe

Table of Contents