Performing A Paint Change; Airfluid Version - WAGNER Sprint 60 L XE Operating Manual

Sprint xe series manual powder system
Table of Contents

Advertisement

VERSION 05/2017
OPERATING MANUAL
7.5

PERFORMING A PAINT CHANGE

7.5.1 AIRFLUID VERSION

Note:
For a paint change, all components of the powder feed system must be thoroughly cleaned.
50
60
40
3
m /h
Ø
30
Tri
3.0
5.5
12
1.5
4.5
11
20
0.5
3.5
10
9
0.3
2.5
8
10
0.1
2.0
100
%
0
%
P_01785
P_1789
To adapt the programs to the new applications proceed as described in the EPG-Sprint XE
control unit's operating manual.
ORDER NUMBER DOC 2354920
70
80
90
17
SP RI N T X
EPG
H
Procedure:
1. Release the trigger on the spray gun.
The high voltage and the powder feed are
deactivated.
2. Lift the feed unit up, underneath the injector,
and lift it out of the tank until retaining clamp
(H) swivels downwards.
3. Lower the feed system into the parking position
and swivel it to the right side so that no more
powder is forwarded.
4. Hold the gun in the spray booth and start the
fl ush function by pressing the "Flush" button (17).
The injector and hoses are fl ushed.
5. Switch off control unit.
6. Clean all powder feeding parts of the unit, such
as the spray gun, the injector and the powder
feed hose.
7. Place an opened powder tank (25–30 kg; 55.11–
66.14 lbs) with the new powder on the vibrator
table.
8. Swivel retaining clamp (H) away, lower the feed
unit to the powder surface, actuate the trigger
of the spray gun for a short time and then
release it.
9. Adjust the fl uid air at the throttle to the point
that the feed unit sinks into the powder due to
its own weight.
SPRINT XE
45

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sprint airfluid xe

Table of Contents