Assembly And Commissioning; Training Of Assembly/Commissioning Personnel; Storage Conditions; Installation Conditions - WAGNER EPG-SPRINT XE Translation Of The Original Operating Manual

Universal control unit for powder spray guns
Hide thumbs Also See for EPG-SPRINT XE:
Table of Contents

Advertisement

Operating manual Universal Control Unit for Powder Spray Guns EPG-SPRINT XE
6   Assembly and Commissioning
6   ASSEMBLY AND COMMISSIONING
6.1   TRAINING OF ASSEMBLY/COMMISSIONING PERSONNEL
– The assembly and commissioning personnel must have the technical skills to safely
commission the device.
– When assembling, commissioning and carrying out all work, read and follow the
operating manuals and safety regulations for the additionally required system
components.
A skilled person must check to ensure that the device is in a reliable state after it is
assembled and commissioned.
6.2   STORAGE CONDITIONS
Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms.
The air temperature at the storage location must be between -20 °C and +60 °C (-4 °F and
+140 °F).
The relative air humidity at the storage location must be between 10 and 95% (without
condensation).
6.3   INSTALLATION CONDITIONS
The air temperature at the installation site must be in a range between 5 and 45 °C; 41 and
113 °F.
Depending on the powder lacquer used, the maximum permissible ambient temperature for
reliable operation can be significantly below 40 °C; 104 °F.
The relative air humidity at the installation site must be between 10 and 95% (without
condensation).
Order number 2354913 | Edition 10/2022
25

Advertisement

Table of Contents
loading

Table of Contents