VERSION 12/2018
6
ASSEMBLY AND COMMISSIONING
6.1
TRAINING OF ASSEMBLY/COMMISSIONING PERSONNEL
The assembly and commissioning personnel must have the technical skills to safely
commission the device.
When assembling, commissioning and carrying out all work, read and follow the
operating manuals and safety regulations for the additionally required system
components.
A skilled person must check to ensure that the device is in a reliable state after it is installed
and commissioned.
6.2
STORAGE CONDITIONS
Until the point of assembly, the device must be stored in a dry location, free from vibrations
and with a minimum of dust. The device must be stored in closed rooms.
The air temperature at the storage location must be between -20 °C and +60 °C
(-4 °F and +140 °F).
The relative air humidity at the storage location must be between 10 and 95%
(without condensation).
6.3
INSTALLATION CONDITIONS
The air temperature at the installation site must lie between 0 °C and 40 °C; 32 °F and 132 °F.
The relative air humidity at the installation site must be between 10 and 95%
(without condensation).
6.4
INSTALLATION AND CONNECTION
The spray gun must be combined with various components to make up a spraying system.
The spraying system shown in the figure is only one example of an AirCoat spraying system.
Your WAGNER distributor would be happy to assist you in creating a spraying system solution
that meets your individual needs.
You must familiarize yourself with the operating manuals and the safety regulations of all
additional system components before starting commissioning.
ORDER NUMBER DOC 350941
GA 250AL_GA 400AL
22