Section 7
Impedance protection
122
OperationZ1: Operation zone 1 On, Off. If OperationZ1 = Off, all pole-slips
with centre of the electromechanical oscillation within zone 1 are ignored.
Default setting = On. More likely to be used is the option to extend zone 1 so
that zone 1 even covers zone 2. This feature is activated by the input to extend
the zone 1 (EXTZ1).
OperationZ2: Operation zone 2 On, Off. If OperationZ1 = Off, all pole-slips
with centre of the electromechanical oscillation within zone 2 are ignored.
Default setting = On.
tBreaker: Circuit breaker opening time. Use the default value tBreaker = 0.000
s if unknown. If the value is known, then a value higher than 0.000 is
specified, for example tBreaker = 0.040 s: the out-of-step function gives a trip
command approximately 0.040 seconds before the currents reach their
minimum value. This in order to decrease the stress imposed to the circuit
breaker.
GlobalBaseSel: This setting identifies the Global Base Values Group where
UBase and IBase are defined. In particular: UBase is the voltage at the point
where the Out-of-step protection is connected. If the protection is connected to
the generator output terminals, then UBase is the nominal (rated) phase to
phase voltage of the protected generator. All the resistances and reactances are
measured and displayed referred to voltage Ubase. Observe that ReverseX,
ForwardX, ReverseR, and ForwardR must be given referred to UBase.IBase is
the protected generator nominal (rated) current, if the Out-of-step protection
belongs to a generator protection scheme.
InvertCTCurr: If the currents fed to the Out-of-step protection are measured on
the protected generator neutral side (LV-side) then inversion is not necessary
(InvertCTCurr = Off), provided that the CT's star point earthing complies with
ABB recommendations, as it is shown in Table 12. If the currents fed to the
Out-of-step protection are measured on the protected generator terminals side,
then invertion is necessary (InvertCTCurr = On), provided that the CT's star
point earthing complies with ABB recommendations, as it is shown in Table
12.
1MRK 511 407-UEN C
Phasor measurement unit RES670 2.2 IEC